Black Friday Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: mxmas70

Home > Exin > EPI Data Centre > CDFOM

CDFOM Certified Data Center Facilities Operations Manager Question and Answers

Question # 4

Which types of maintenance service offerings are commonly offered by vendors?

A.

Silver, Gold, Platinum

B.

Basic, Premium, Premium +

C.

Basic, Normal, Comprehensive

D.

Time & Material, Basic, Comprehensive

Full Access
Question # 5

The data center is conducting a needs analysis.

Which of the below is an activity of the needs analysis?

A.

Identifying the operating hours for the service

B.

Identifying the current usage for power and cooling

C.

Identifying the required headcount to operate the service

D.

Identifying monitoring requirements

Full Access
Question # 6

The data center organization conducted a customer satisfaction survey and concluded that a very low number of customers participated.

What is the most likely cause?

A.

The survey did not have enough questions

B.

The survey was not sent on behalf of the data center manager

C.

The survey had too many questions

D.

The survey was sent by postal mail instead of e-mail

Full Access
Question # 7

In and around the data center, who is responsible for safety?

A.

The safety manager

B.

The facilities manager

C.

All staff

D.

The managing director

Full Access
Question # 8

Urgent maintenance work is required. Data center maintenance engineers collect electrical portable equipment from the warehouse and a few items have loose-fitting electrical cabling. Further checks indicate that it is not possible to determine when the last equipment test took place.

What is the next best action to take place?

A.

Straight away use the equipment since the maintenance works are urgent

B.

Apply duct tape to fix the electrical cabling so that the equipment is ready for usage

C.

Label the equipment as ‘out of service’ and schedule for testing

D.

Dispose of the equipment immediately

Full Access
Question # 9

Welding works need to be conducted.

Is a Permit to Work (PTW) required and if so, what type of PTW?

A.

Welding is covered under standard maintenance work, a PTW is not required

B.

A PTW is required for energy work

C.

A PTW is required for cold work

D.

A PTW is required for hot work

Full Access
Question # 10

Customers of the data center want to know how much of the data center's power comes from renewable sources.

What should the data center service provider do to respond to these requests?

A.

Request the power company to provide an estimate

B.

Inform the customer that it is not possible to exactly determine how the power is generated

C.

Ignore the request since the source of power generation is not part of the SLA

D.

Implement the Renewable Energy Factor (REF) and report accordingly

Full Access
Question # 11

Of the below, which is a power efficiency indicator?

A.

nil, w

B.

PUE

C.

CPU

D.

uw

Full Access
Question # 12

The organization is implementing an information security management system (ISMS).

What is the common process model to follow?

A.

SMART

B.

PCI-DSS

C.

ROI

D.

PDCA

Full Access
Question # 13

The organization plans for implementing an information security management system (ISMS).

By doing so, what is the main objective?

A.

Preservation of an organizations’ financial and organizational records

B.

Preservation of confidentiality and format of organizational assets

C.

Preservation of confidentiality, integrity and availability of organizational assets

D.

Preservation of customer agreements and records

Full Access
Question # 14

During inventory of assets it is identified that a number of items are in a different location compared to what is indicated on the inventory list.

What is the most likely root cause of this?

A.

Lack of staff training

B.

Lack of procedures

C.

Lack of asset management database capabilities

D.

Lack of finance

Full Access
Question # 15

When is the right moment to label assets?

A.

The moment support and maintenance contracts apply

B.

The moment of unpacking the equipment

C.

The moment of testing the equipment

D.

The moment of commissioning the equipment for production

Full Access
Question # 16

Data center operators complain about receiving too many non-alarm conditions.

What is the best response?

A.

Retrain staff on how to monitor the data center equipment

B.

Conduct a review of alarm information

C.

Instruct data center operators to ignore the non-alarm notifications

D.

Upgrade the monitoring system software to the latest version

Full Access
Question # 17

Who is accountable for the outcome of a project?

A.

The project manager

B.

The user/customer

C.

The business

D.

The supplier

Full Access
Question # 18

Failure probability of mechanical equipment components is high, and management wants to keep downtime to an absolute minimum.

Which is the best spare part option to choose?

A.

No parts at site

B.

Basic parts at site

C.

Full parts at site

D.

Only high-cost parts at site

Full Access