Home > IIBA > Certified Business Analysis Professional > CBAP

CBAP Certified Business Analysis Professional (CBAP) Designation Question and Answers

Question # 4

Which of the following statements best describes the purpose of the confirm elicitation results process?

A.

Validate that the stated requirements expressed by the stakeholders match the solution the organization has proposed.

B.

Validate that the stated requirements expressed by the stakeholders match the stakeholders' understanding of the problem and the stakeholders' needs.

C.

Validate that the stated requirements expressed by the stakeholders match the documented requirements of the project sponsor.

D.

Validate that the stated requirements expressed by the stakeholders match the project scope.

Full Access
Question # 5

You are the business analyst for THY Organization and you have gathered the requirements. You have presented the requirements to the stakeholders and they have approved your requirements.

You are now working with Francie on recording the dependencies and relationships for each of the requirements.

Why would you want to record the dependencies and relationships for the requirements?

A.

To help determine the sequence in which requirements are to be addressed.

B.

To help determine which requirements carry the most risk.

C.

To help determine the total cost for the solution to be implemented.

D.

To help determine the total time for the solution to be implemented.

Full Access
Question # 6

You are the business analyst for a large software development project. There are several issues that must be resolved by certain dates or the problem will prevent the project from advancing.

What technique can you use to track problems with the requirements?

A.

Problem tracking

B.

Issue tracking

C.

RTM

D.

Baselining

Full Access
Question # 7

Which of the following is a flowchart that shows all the processes and the interfaces that interact with the project processes?

A.

Process configuration

B.

Pareto chart

C.

Control chart

D.

Quality baseline

E.

RACI chart

Full Access
Question # 8

You are the business analyst for your organization and are currently with several key stakeholders as part of the determination of which business analysis approach is most appropriate for the current project.

Which one of the following is not a stakeholder that is considered when completing the business analysis planning and monitoring task to determine a business analysis approach?

A.

Tester

B.

Project manager

C.

Regulator

D.

Functional management

Full Access
Question # 9

Which of the following tasks does not rely on other activities, and no other activities rely on this task completing?

A.

Analysis task

B.

Independent task

C.

Predecessor task

D.

Dependent task

Full Access
Question # 10

Holly is the business analyst for her organization. Management has asked Holly to create a document that will define solution alternatives and how each identified solution may provide an expected business benefit to meet the identified business need. Management has asked Holly to provide data and statistics in this document to support her claims and findings.

What type of document is management asking Holly to create?

A.

Feasibility study

B.

Vision statement

C.

Project scope statement

D.

Current state assessment

Full Access
Question # 11

What type of a business analysis approach focuses on the rapid delivery of business value in short iterations?

A.

Risk-driven

B.

Change-driven

C.

Risk-laden

D.

Profit-driven

Full Access
Question # 12

You are creating the solution scope for an identified problem in your organization. You are working with several stakeholders during this process including the domain subject matter expert, the implementation subject matter expert, the project manager, and the sponsor.

Which of these stakeholders will be responsible for writing the project scope?

A.

Domain subject matter expert

B.

Business analyst

C.

Project manager

D.

Sponsor

Full Access
Question # 13

Which of the following is an estimate based on past projects to predict the current cost and/or duration of the current project?

A.

Current estimate

B.

Past project cost

C.

Past estimate

D.

Top-down estimate

Full Access
Question # 14

You are completing enterprise analysis. Management has asked you to create a document that will help them create a go/no go decision to invest and more forward with a proposed project.

What document does management want you to create?

A.

Feasibility study

B.

Project scope

C.

Solution scope

D.

Business case

Full Access
Question # 15

You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables.

The inspector's signoff on the initial deliverables is called what?

A.

Assumption

B.

Dependency

C.

Milestone

D.

Constraint

Full Access
Question # 16

Paul has been asked to complete SWOT analysis for his solution scope. What does SWOT analysis mean?

A.

Strengths, Weaknesses, Opportunities, Time

B.

Stakeholder Weaknesses, Organizational Threats

C.

Stakeholders Weaknesses, Organization, Threats

D.

Strengths, Weaknesses, Opportunities, Threats

Full Access
Question # 17

You are the business analyst for your organization and are working on prioritizing requirements.

What plan should guide you through this process?

A.

Risk management plan

B.

Project management plan

C.

Requirements management plan

D.

Scope management plan

Full Access
Question # 18

What part of defining the business needs process will evaluate the ends that the organization is seeking to achieve?

A.

Business goals and objectives

B.

Alternative identification

C.

Solution assessment

D.

Requirements

Full Access
Question # 19

Which of the following techniques involves determining and documenting the variance between business requirements and current capabilities?

A.

Risk analysis

B.

Schedule analysis

C.

GAP analysis

D.

Cost benefit analysis

Full Access
Question # 20

is a process to determine the completeness of the project work and to gain the customer's acceptance to move the project forward.

A.

Phase gate review

B.

Inspection of key results

C.

Verify scope

D.

Quality control

Full Access
Question # 21

Jenni is the business analyst for the UHQ Organization. She is preparing to complete the conduct elicitation activity for her organization.

Jenni can use all of the following techniques as part of this activity except for which one?

A.

Requirements workshops

B.

Document analysis

C.

Interviews

D.

Problem tracking

Full Access
Question # 22

You are the business analyst for your organization and are working on a solution that will connect several databases to a web application. You are concerned that the databases may not be operable with the software solution a programmer is recommending.

What requirements elicitation technique can help you determine the interoperability of the software, the databases, and the web application?

A.

Benchmarking

B.

Interviews

C.

Interface analysis

D.

Usage considerations

Full Access
Question # 23

You are completing the prepare for elicitation process for an identified problem in your organization. The prepare for elicitation process requires three inputs for this process.

Which one of the following is not an input that will help you prepare for the elicitation activities?

A.

Stakeholder list

B.

Stakeholder concerns

C.

Business need

D.

Solution scope

Full Access
Question # 24

What is the degree to which a set of inherent characteristics fulfills requirements.

A.

Quality

B.

Regulation

C.

Project phase

D.

Scope

Full Access
Question # 25

You are the business analyst for your organization and are preparing to conduct stakeholder analysis. As part of this process you realize that you'll need several inputs.

Which one of the following is NOT an input you'll use for the conduct stakeholder analysis task?

A.

Enterprise architecture

B.

Enterprise environmental factors

C.

Organizational process assets

D.

Business need

Full Access
Question # 26

Which of the following is the best definition of the business rules analysis?

A.

To define the people that govern decisions in and organization and that define, constrain, or enable organizational policies.

B.

To define the job functions, roles and responsibilities, and the designation of power among the project stakeholders.

C.

To define the rules that govern decisions in and organization and that define, constrain, or enable organizational policies.

D.

To define the historical information that is available for the business analyst to rely on for his research.

Full Access
Question # 27

What requirements elicitation involves carefully selected stakeholders and subject matter experts for a short, intensive period (usually for one to a few days) to define and document the requirements for a solution?

A.

Many-to-many interviews

B.

Requirements workshop

C.

Focus group

D.

Prototyping

Full Access
Question # 28

Henry is the business analyst for his organization and is completing the conduct elicitation activity. Part of this activity is to record the results of the requirements elicitation process.

All of the following are acceptable elements for requirements documentation except for which one?

A.

Text message sent via a secured mobile phone

B.

Written documents describing the outcomes

C.

Visual or audio recordings

D.

Whiteboards

Full Access
Question # 29

The RGQ Organization utilizes a change log.

What is a change log?

A.

It is a document that records all change requests for the project.

B.

It is a document that tracks all unauthorized changes to the project solution.

C.

It is a document that tracks all characteristics and status of changes that have been received.

D.

It is a document that tracks the changes that have been received, including their implementation to the project solution.

Full Access
Question # 30

You are the business analyst for your organization and are planning the business analysis approach. One of the techniques you are considering for this undertaking is to rate the available methodologies against the organizational needs and objectives.

Which of the following terms describes the business analysis technique that you are currently considering in this scenario?

A.

Structured walkthrough

B.

Decision analysis

C.

Cause-and-effect analysis

D.

Process modeling

Full Access
Question # 31

Which of the following documents is described in the statement below?

"It is a type of procurement document used to request proposals from prospective sellers of products or services."

A.

Request for quote

B.

Request for information

C.

Request for bid

D.

Request for proposal

Full Access
Question # 32

Which of the following is mandatory in most software development projects?

A.

Communication Management plan

B.

Disaster recovery plan

C.

Test plan

D.

Procurement plan

Full Access
Question # 33

You are the business analyst for a large project in your organization. You are working with Ben to create requirements packages to present to the stakeholders, the business analyst team, and to the project manager. Ben wants to know why you're creating requirements packages.

What's the primary goal of developing a requirements package?

A.

To convey the cost, schedule, and risk information clearly

B.

To convey information clearly and in an understandable fashion

C.

To present the requirements in packages that are easy for the project team to accomplish in their project execution

D.

To help the project manager create the work breakdown structure

Full Access
Question # 34

You are the business analyst for a new project. Part of this project is for the project team to manually install new workstations through the company's campus. Based on your research you have determined that the project team can install 25 new workstations per hour. Since there is a fixed amount of time that these workstations need to be installed you are considering adding additional labor for the implementation. You are also considering to adjust the prioritization of the project requirements based on the amount of workstations the project team can install per hour.

What does the 25 workstations per hour represent in this scenario?

A.

Timeboxing

B.

Planning

C.

Parametric estimate

D.

Report project

Full Access
Question # 35

You have completed the requirements documentation and the stakeholders have signed off on the requirements. Now the requirements are advancing into a project as your organization has chartered a project based on the identified requirements.

What stakeholder is now responsible for assessing the solution scope to determine the project scope?

A.

Project sponsor

B.

Project manager

C.

Business analyst

D.

Key stakeholders

Full Access
Question # 36

There are just three inputs to the assess proposed solution process.

Which of the following is NOT one of the inputs for the assess proposed solution process?

A.

Requirements

B.

Decision analysis

C.

Assumptions and constraints

D.

Solution options

Full Access
Question # 37

What element of the conduct elicitation activity is tracked to provide a basis for future planning?

A.

Time actually spent eliciting the requirements

B.

Number of stakeholders that did not participate in the requirements elicitation

C.

Cost of actually eliciting the requirements

D.

Changes that entered the scope throughout the requirements elicitation activities

Full Access
Question # 38

You are the business analyst for your organization and need a method to requirements elicitation from nearly 12,000 stakeholders. You want a method to quickly capture this group's feelings and thoughts to identify what the majority of this group needs and wants in a new solution your organization may create.

What requirements elicitation technique can be used in this scenario?

A.

Interviews

B.

Trend analysis

C.

Focus groups

D.

Surveys

Full Access
Question # 39

You are the business analyst for your organization. Management realizes that a proposed solution has risks that may cause the entire project to fail. They would like you to prioritize the requirements with maximum risks first so that if the project fails, there is little loss of capital in the project implementation.

What requirements prioritization approach is management asking you to create in this instance?

A.

Implementation difficulty

B.

Business or technical risk

C.

Likelihood of success

D.

Relationship to other requirements

Full Access
Question # 40

Management has asked you, a business analyst for your organization, to create the solution scope for an identified problem. In order to complete this task, you'll need three elements.

All of the following are elements you'll need in order to write the solution scope except for which one?

A.

Work breakdown structure

B.

Implementation approach

C.

Solution scope definition

D.

Dependencies

Full Access
Question # 41

You are the business analyst for your organization and management has asked that you identify opportunities to improve the operations of the business. You notice that some of the stakeholders use several pieces of software and several duplicate activities within each software package to generate data reports for customers.

What type of recommendation can you make in regard to this observation?

A.

You can address the automation of how the workers perform.

B.

You will need to perform active observation first to understand the processes in more detail.

C.

You can address the non-functional requirements of the activities.

D.

You will need to perform passive observation first to understand the processes in more detail.

Full Access
Question # 42

You are preparing a business case for your organization to determine the justification of the costs of the solution in relation to benefits the solutions will bring the organization. You need four inputs to complete this process.

Which one of the following is not an input that will help you write the business case?

A.

Feasibility study

B.

Stakeholder concerns

C.

Assumptions and constraints

D.

Business need

Full Access
Question # 43

You are the business analyst for your organization. Gary and Janet, two key stakeholders in the project, are in disagreement over a requirement for the type of software to be installed on the server your solution calls for.

What must happen in this instance before formal approval can be offered?

A.

The conflict will need to be resolved through research, resolution, or through a third-party mediation.

B.

Gary and Janet will need to determine who has seniority in the company to determine which requirement takes precedence.

C.

The conflict will need to be removed from the solution scope until Gary and Janet come to a solution.

D.

The business analyst will need to make a decision on which requirement is most appropriate.

Full Access
Question # 44

Jane is the business analyst for her organization and she is completing passive observation to identify improvement opportunities in the workflow. She notices that some of the employees perform certain customer- facing activities in a different format than the other workers.

Is this a problem that can be addressed as part of an improvement opportunity?

A.

It can be a problem as customers could become confused or frustrated because of the different approaches to the work.

B.

It is not a problem unless there is a drop in sales so it should be left alone.

C.

It can be a problem as the enterprise environmental factors always call for consistency in all processes.

D.

It is not a problem unless the customer complains. If Jane has not noticed the customers complaining then the process should be left along.

Full Access
Question # 45

Holly's organization uses a plan-driven approach to business analysis.

When it comes to communication in Holly's organization what type of communication will likely be required?

A.

Face-to-face

B.

Chain of command

C.

Formal

D.

Ad hoc

Full Access
Question # 46

You are creating a model for your requirements.

Which model type categorizes and describes the people who directly interact with a solution?

A.

Rules

B.

User classes, profiles, or roles

C.

Concepts and relationships

D.

Events

Full Access
Question # 47

You need to identify assumptions as part of the assessment of capability gaps.

Which of the following is an example of an assumption?

A.

The project manager believes that her project team members can program in COBOL.

B.

All vendors must have security clearance.

C.

The software must be compatible with the current operating system.

D.

The risk in the project must be quantified.

Full Access
Question # 48

You are creating the solution scope for a proposed solution in your organization. You need to understand the scope of work that needs to be completed. You elect to identify the solution scope and then break the solution scope into smaller work products or deliverables.

What technique are you using in this instance?

A.

Interface analysis

B.

Scope modeling

C.

Vision statement creation

D.

Functional decomposition

Full Access
Question # 49

Fred's organization is using a plan-driven approach for the business analysis deliverables.

In this approach how will the requirements be captured?

A.

Fred will use the appropriate documentation at the discretion of the business analysis team.

B.

Fred will use the project management information system.

C.

Fred will use whatever business analysis forms are most appropriate.

D.

Fred will use standardized templates.

Full Access
Question # 50

Ben is the business analyst for his organization. Ben is currently working on a solution to improve a laser printer. He has taken the laser printer apart, identified each component, and documented each component's purpose.

What type of requirements organization is Ben doing in this scenario?

A.

Process modeling

B.

Data modeling

C.

Functional decomposition

D.

Scope modeling

Full Access
Question # 51

You are the business analyst for your organization. On your current project you'll be using the change-driven approach for defining requirements and gathering feedback.

Which of the following statements best describes the change-driven approach?

A.

The change-driven approach favors defining requirements through experimentation.

B.

The change-driven approach does not define the requirements until after a solution for the problem has been identified.

C.

The change-driven approach favors defining requirements standardized templates.

D.

The change-driven approach favors defining requirements through team interaction.

Full Access
Question # 52

You are the business analyst for your organization and are in the process of creating the solution approach for a technology problem.

Which one of the following definitions best describes the solution approach?

A.

It is the documentation and control of changes to the product scope as approved by the project stakeholders.

B.

Defines the general approach that will be taken to create or acquire new capabilities required to meet the business need.

C.

It is an uncertain event or condition that may have a positive or negative impact on the abilities of the chartered project.

D.

Decomposes the project scope into smaller deliverables; each deliverable is subdivided repeatedly until the deliverable cannot or should not be broken down any further.

Full Access
Question # 53

You are the business analyst for your organization and are preparing to complete the allocate requirements process. This process assigns stakeholder and solution requirements to solution components and to releases. One of the elements of this process is solution components.

All of the following are solution components except for which one?

A.

Assessment of proposed solution

B.

Business processes to be performed and managed

C.

Business policies and business rules

D.

Software applications and application components used in the solution

Full Access
Question # 54

Henry is the business analyst for his organization. Management has created a pre-determined budget of

$450,000 for his solution. Henry has identified the project requirements but now wants to prioritize them based on timeboxing and budgeting. Henry examines the cost of the requirements and begins removing the requirements from the allowed list in order to meet the $450,000 budget.

What timeboxing or budgeting approach is Henry using?

A.

Parametric

B.

All in

C.

Selective

D.

All out

Full Access
Question # 55

Which conduct stakeholder analysis technique identifies stakeholder roles that may serve as a useful starting point for identifying actors and roles?

A.

Scope modeling

B.

Requirements workshops

C.

Scenario and uses cases and user stories

D.

Interviews

Full Access
Question # 56

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex.

What thing adds to the level of complexity among requirements?

A.

Relationships among the requirements

B.

Management in the project

C.

Stakeholders in the project

D.

Cost and schedule constraints

Full Access
Question # 57

What plan includes the description of the scope of work, the deliverable Work Breakdown Structure, the activity list, and estimates for the business analysis activities?

A.

Project management plan

B.

Implementation plan

C.

Requirements management plan

D.

Business analysis plan

Full Access
Question # 58

What document defines the business needs, identifies key stakeholders, and describes the positive impact the solution will provide on the key stakeholders?

A.

Project charter

B.

Project scope statement

C.

Solution scope

D.

Vision statement

Full Access
Question # 59

What two factors must the business analyst consider when conducting stakeholder analysis?

A.

Politics and influence

B.

Influence and attitude

C.

Attitude and position

D.

Position and politics

Full Access
Question # 60

You are the business analyst for your organization. Management has asked that in the business case you're creating that you also include the projected costs and benefits to be realized and how those and benefits will be assessed and evaluated.

What term matches management's request?

A.

Cost-benefits justification

B.

Risk assessment

C.

SWOT analysis

D.

Results measurements

Full Access
Question # 61

A business analyst (BA) plans to hold a workshop next week to elicit requirements for a project. In an informal conversation, another employee mentioned that one of the attendees is likely to be unhappy about the project's impact on their work.

Which of the following techniques will the BA use to avoid disrupting the workshop?

A.

Elicitation Activity Plan

B.

Collaborative Games

C.

Stakeholder List

D.

Risk Analysis and Management

Full Access
Question # 62

Which of the following processes includes tasks and roles, risk categories, schedules for risk management activities, definitions of probability and impact, and the stakeholders' tolerances?

A.

Risk management plan

B.

Risk register

C.

Risk analysis

D.

Risk response plan

Full Access
Question # 63

Which of the following is described in the statement below?

"It shows the history and pattern of variation. It is a line graph that shows data points plotted in the order in which they occur. They show trends in a process over time, variation over time, or declines or improvements in a process over time. Trend analysis is performed using them."

A.

Cause and effect diagram

B.

Histogram

C.

Run chart

D.

Pareto chart

Full Access
Question # 64

Which one of the following diagrams when properly laid out is always laid in a left to right display to properly reflect the chronology of all project work?

A.

Influence diagram

B.

Project schedule network diagram

C.

Arrow diagramming method

D.

Time-scaled schedule network diagram

Full Access
Question # 65

Which of the following establishes organizational checks and balances with a proper segregation of front, back, and middle office functions for effective risk management?

A.

Risk response plan

B.

Risk analysis

C.

Risk management plan

D.

Risk governance

Full Access
Question # 66

The business analyst (BA) has been tasked with assessing and recommending the best solution that fits an organization's need for a new third-party sales tool.

What technique would be used for identifying suitable options?

A.

Balanced scorecard

B.

Decision analysis

C.

Vendor assessment

D.

Process analysis

Full Access
Question # 67

An online stock trading system is under implementation.

Which of the following events can be considered as a trigger for re-prioritization?

A.

A team member has left the project and is being replaced

B.

A new initial public offering in the stock market is introduced

C.

Further dependencies among solution components are uncovered

D.

Number of reported quality defects is growing through phases

Full Access
Question # 68

Which of the following displays the relative importance of the defects?

A.

Pareto diagram

B.

User Documentation

C.

Gantt chart

D.

Flowchart

Full Access
Question # 69

What portion of the communications model could be defined as the translator?

A.

Receiver

B.

Medium

C.

Translator

D.

Sender

Full Access
Question # 70

Which of the following are directed conversations for gathering ideas, opinions about a product, service, problem, or opportunity?

A.

Interviews

B.

Group discussions

C.

Feedback loops

D.

Focus groups

Full Access
Question # 71

A software company has won a contract to implement its product for a client. As part of the implementation work, a business analyst (BA) is asked to elicit information about the other client applications that will interface with the new system and provide the information graphically. The technical staff needs to understand the message interaction within the systems for key business transactions.

Which type of diagram should the BA use?

A.

Process

B.

Sequence

C.

Activity

D.

Context

Full Access
Question # 72

In performing the task of planning for business analysis governance for a software implementation project, the business analyst (BA) recommends that prioritization of requirements be done based on the amount of work that the project team is capable of delivering in a given period of time.

Which of the following techniques is the BA recommending?

A.

Negotiation

B.

Grouping

C.

Time Boxing

D.

Budgeting

Full Access
Question # 73

The business process model is also known as.

A.

Organization model

B.

Activity model

C.

Relational model

D.

Data flow model

Full Access
Question # 74

Which of the following charts is described in the statement below?

"It shows the causes of a certain event. A common use of this diagram is to identify potential factors causing an overall effect. It helps identify causal factors and contributing causes."

A.

Ishikawa

B.

Flowchart

C.

Process configuration chart

D.

Control chart

Full Access
Question # 75

Which of the following types of charts shows which resources are needed in the project and allows you to group the resources by project phase or other attributes?

A.

Pareto chart

B.

Organizational Breakdown Structure

C.

Gantt chart

D.

Resource Breakdown Structure

Full Access
Question # 76

Which of the following is a method of displaying the timelines of all the various subtasks that are involved in any project?

A.

Pie chart

B.

Scatter chart

C.

Activity network diagram

D.

Cost-benefit analysis

Full Access
Question # 77

Which of the following defines the deliverable the customer is expecting?

A.

Project charter

B.

Procurement management plan

C.

Product scope statement

D.

Project network diagram

Full Access
Question # 78

Which of the following stages of a project defines the number of risks and opportunities, including intense planning and anticipation of risk events?

A.

Planning

B.

Executing

C.

Initiation

D.

Closing

Full Access
Question # 79

Which of the following is a visual decomposition of the program scope and the resources needed in order to create the things defined within the program scope?

A.

Resource breakdown structure (RBS)

B.

product breakdown structure (PBS)

C.

Budgeted Cost of Work Scheduled (BCWS)

D.

Work Breakdown Structure (WBS)

Full Access
Question # 80

Whatare timeless events that show progress in the project.

These are typically achieved at the end of phase in the project lifecycle.

A.

Achievements

B.

Millstones

C.

Phases

D.

Templates

Full Access
Question # 81

A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst

(BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations.

Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time.

Customers who want to utilize the pay per use mobile device fast charging stations may choose one of two features: fully charged (F1) or partially charged (F2). If partially charged is selected, the customer needs to specify their charging needs.

What is the relationship between F1 and F2?

A.

Validate

B.

Derive

C.

Depends

D.

Satisfy

Full Access
Question # 82

Which of the following processes is must at the end of each project phase to determine the completeness of the project work and to gain the customer's acceptance to move the project forward?

A.

Scope verification

B.

Inspection of key results

C.

Quality control

D.

Phase gate review

Full Access
Question # 83

A company wants to launch an existing product in another channel and the business analyst (BA) is starting to perform the stakeholder analysis.

Legend: Influence/Impact 1 to 5 (1 = very limited impact/influence: 5 = very high impact/influence). Considering the analysis, what values for influence and impact will the BA assign to the marketing?

A.

Influence = 3 and impact = 3

B.

Influence = 1 and impact = 3

C.

Influence = 3 and impact = 1

D.

Influence = 5 and impact = 5

Full Access
Question # 84

A business analyst (BA) is in the process of allocating requirements to various releases of a solution.

On what should the BA base requirements to maximize the value of the solution?

A.

Priority set by stakeholders

B.

Available resources

C.

Timing of the release and its impact on business

D.

Components in scope for that release

Full Access
Question # 85

Contracts are currently managed by more than 20 contract owners across the organization, each happily managing in their own way. A business analyst (BA) is tasked to elicit requirements for centrally managing software maintenance and license contracts.

Which of the following does the BA need to carry out first?

A.

Identify business requirements

B.

Identify future state conditions

C.

Recommend an off the shelf product

D.

Complete an enterprise readiness assessment

Full Access
Question # 86

The, an output of the define scope process, does document the process and criteria for accepting completed products.

A.

Statement of Work

B.

Contract

C.

Project scope statement

D.

Project management plan

Full Access
Question # 87

Which of the following is responsible for preparing the business architecture, feasibility studies, and business cases?

A.

Security Administrator

B.

Developer

C.

Business analyst

D.

Project leader

Full Access
Question # 88

A new project has to implement a cyber security release in China, Italy, Germany, the United States, and Canada. The project is a $5 million initiative and must 'go live' in production in all countries on the same day and time to be effective.

Which of the approaches mentioned is suitable for this project based on the size and complexity?

A.

An agile and iterative approach

B.

A waterfall and dynamic approach

C.

A kanban and predictive approach

D.

A proven and tailored analysis approach

Full Access
Question # 89

Which of the following is the comparison of planned project results with actual project results?

A.

Variance analysis

B.

Cost-benefit analysis

C.

Statistical Sampling

D.

Trend analysis

Full Access
Question # 90

The business sponsor of a project to automate a high risk, high profile process has expressed concerns that some activities people perform will be missed. The business analyst (BA) has already created a process flow with associated user stories.

Which of the following actions will address the sponsor’s concerns?

A.

Record the concerns in the risk register

B.

Schedule a formal review with the stakeholders

C.

Demonstrate traceability to the business case

D.

Review the final approved elicitation results

Full Access
Question # 91

In a requirements management effort, the business analyst (BA) has reviewed all the requirements and has completed assessing the various impacts of changes to some of the requirements. The BA is planning to share the impact of the changes to the stakeholders and obtain a consensus in resolution of some of the changes. Which technique will help the Ba obtain a resolution on the impact of the requirement changes?

A.

Focus groups

B.

Workshops

C.

Interviews

D.

Surveys

Full Access
Question # 92

A business analyst (BA) is compiling a communication plan by reviewing stakeholders and identifying the needs of the stakeholders. The BA organizes the stakeholders based on their needs and decides that all communication Mil be handled through e-mail so that information can be disseminated quickly and easily while maintaining a record. What has the BA missed in the stakeholder analysts?

A.

Business objectives

B.

Preferences

C.

Retention

D.

Presentation materials

Full Access
Question # 93

A business analyst (BA) assigned to a project has been asked to implement regulatory requirements based on priority. What type of traceability relationship can the BA use to find an the solution components that need to be implemented?

A.

Satisfy

B.

Dependency

C.

Validate

D.

Derive

Full Access
Question # 94

The solutes presented by a business analyst (BA) to the stakeholders eliminated the need to maintain different variations of ship-to-country and location-to-rout* for various freight carriers. Instead, the routing would use a standard carrier code, giving the business me flexibility to just ship to new countries without raising a change request to IT. which was the current road-block to business. What opportunity did the BA present to the stakeholders?

A.

Increase efficiencies

B.

Decrease stakeholder involvement

C.

increase access to information

D.

Decrease project timeline

Full Access
Question # 95

A conservative company with rigorous risk control plans and internal audit rules has a recurrent problem with a core Business application. As a result access to this application must be restricted and controlled and maintenance must be on-site. However, the company feels that the application must have an emergency service team. The routine maintenance of this solution is provided by an external vendor and the vendor requested 24 hours remote access to quality and production data. In this context what is the company's response to the vendor's request?

A.

Dented because of the company’s risk aversion

B.

Accepted, because the company has an urgent problem to solve

C.

Denied- because the vendor requested it

D.

Accepted, because immediate remote access will resolve any issue

Full Access
Question # 96

While reviewing the data feeds on a project the business analyst (BA) realizes there is a feed that contains complex relationships. In order to help understand the data and accurately reflect a set of requirements the BA decides to prioritize the requirements. What modeling format could the BA use?

A.

User interface

B.

Matrix

C.

Data model

D.

Data dictionary

Full Access
Question # 97

Due to the complexity of a project the project board a concerned that the business analyst (BA) will not be able to ensure all requirements are verified. What toed can the BA present to the project board to mitigate their concern?

A.

Data model

B.

Use case diagram

C.

Risk register

D.

Business analysis checklist

Full Access
Question # 98

A business analyst (BA) is assessing tie different solution proposals. What type of financial calculation would the BA use to determine which solution is worth investing in based on its breakeven point?

A.

Discount rate

B.

Net present value

C.

Return on investment

D.

Internal rate of return

Full Access
Question # 99

The table illustrate the statement of cash flower for a courier company for the last fiscal year:

Due to aggressive market competition the management of the company performed a strategy review and based on their0-findings and the current market conditions, they came up with strategic and tactical changes in order to keep a competitive market position.

In order to strength customer retention strategies through a new competitive advantage, the company is considering implementing a live parcel tracking system. The added value will be that the customers may determine the exact location on of the parcel whether it is in a warehouse, crossing the ocean through an overseas the exact location of th parcel whether it is in a warehouse, crossing the ocean through an overseas the ship, or travelling in a delivery truck at any time. The system tracks the location of the parcel by tracking the vehicle in which it is contained. However, for a group of old delivery trucks, it was noticed that the engine sound and vibration disturbed the tracking signal and caused of management would like to sell these vehicles and replace them with newer ones, the Chief Financial Officer (CFO) was strongly against that approach. The CFO argoad that instead of hanging tracking devices on the trucks body they can have the truck drivers manually send the truck send the truck location from a hand held mobile device every 20 minutes.

The CFO's resistance to replacing the older vehicles represents which type of cost?

A.

Maintenance

B.

Operating

C.

Opportunity

D.

Sunk

Full Access
Question # 100

A business analyst (BA) is eliciting requirements to automate existing manual processes for fulfilling end users service requests. There is pressure from management to automate the process quickly using a commercial off-the-shelf (COTS) tool. The COTS solution has various modules including one for service request automation that has yet to be implemented in the organization. What e the BA's first step?

A.

Perform a gap analysis to understand missing capabilities

B.

Implement the COTS tool's modules

C.

Modify the COTS tool to fit the existing process

D.

Create a change strategy

Full Access
Question # 101

The table illustrate the statement of cash flower for a courier company for the last fiscal year:

Due to aggressive market competition the management of the company performed a strategy review and based on their0-findings and the current market conditions, they came up with strategic and tactical changes in order to keep a competitive market position.

In order to strength customer retention strategies through a new competitive advantage, the company is considering implementing a live parcel tracking system. The added value will be that the customers may determine the exact location on of the parcel whether it is in a warehouse, crossing the ocean through an overseas the exact location of the parcel whether it is in a warehouse, crossing the ocean through an overseas the ship, or travelling in a delivery truck at any time. The system tracks the location of the parcel by tracking the vehicle in which it is contained. However, for a group of old delivery trucks, it was noticed that the engine sound and vibration disturbed the tracking signal and caused of management would like to sell these vehicles and replace them with newer ones, the Chief Financial Officer (CFO) was strongly against that approach. The CFO argued that instead of hanging tracking devices on the trucks body they can have the truck drivers manually send the truck send the truck location from a hand-held mobile device every 20 minutes.

What could the business analyst (BA) do to gain consensus between the CFO and other Management?

A.

Calculate the costs incurred by each option

B.

Recommend and present a completely new option

C.

Compare each option against an industry benchmark

D.

Estimate the potential value delivered by each option

Full Access
Question # 102

A bank moves currency from the mam office to the tranches daily for operational use. To avoid paying overnight interest, the branch** return the currency at the end of the business day. The Bank requires a new inventory management system to account for the whereabouts of the cash at all times A software provider has proposed a heavily customized version of their standard inventory management software. As the project progresses, the business analyst (BA) identifies a number of subtleties that would suggest a fully made to order solution may be a better option for the bank. What inputs does the BA need to perform the analysis?

A.

Requirements and business policies

B.

Needs and business analysis approach

C.

Change strategy and performance objectives

D.

Potential value and design options

Full Access
Question # 103

What is the increased cost in Scenario 2 for Company C?

A.

$453.635

B.

$207.790

C.

$653.934

D.

$695.448

Full Access
Question # 104

What kind of analysis must the BA do to determine if one of the systems is better suited to be modified and upgraded?

A.

Risk Analysis

B.

Stakeholder Analysis

C.

Process Analysis

D.

Decision Analysis

Full Access
Question # 105

A business analyst (BA) working on a recently implemented project is approached by the sponsor to provide artifacts that can be used organization wide for the long -term. Which of the following should the BA provide?

A.

Transition requirements document

B.

Project solution architecture

C.

High-level business requirements document

D.

Process models

Full Access
Question # 106

A business analyst (BA) is preparing a requirement package for access management system. A state diagram foe entity 'User* has been prepared. The BA wants to check the completeness of requirements by comparing different models. Which diagram should be used with a state diagram to verity that all functions are defined to work with entity "User" for the different roles?

A.

Sequence diagram

B.

Functional diagram

C.

Use case diagram

D.

Data flow diagram

Full Access
Question # 107

Before investing further in the project, a customer and the key stakeholders of the project want to be able to visualize the final product. Which elicitation technique should the business analyst (BA) select?

A.

interface Analysis

B.

Reverse Engineering

C.

Observation

D.

Prototyping

Full Access
Question # 108

A busmen analyst (BA) is assigned a new project to improve a delivery process. Which of the following does the BA create as an output of the initial meeting with experts?

A.

Entity relationship diagram

B.

Elicitation activity plan

C.

Current state flowchart

D.

Information management approach

Full Access
Question # 109

A business analyst (BA) finds that the proposed solution has features used by a small group of stakeholders for business scenarios which may occur up to three times a year Out require a high effort to implement. What should the BA recommend in this cast?

A.

Change the related business process

B.

Remove the requirement

C.

Assign it a lower priority for future release

D.

Deliver as part of the initial release

Full Access
Question # 110

A business analyst (BA) has a meeting next week with the project sponsor to ensure that the requirements align with the objective of the project. Prior to the meeting, the BA must ensure that the requirements are:

A.

parametric, analogous, and decomposed

B.

atomic, feasible and testable

C.

predictive, diagnostic, and descriptive

D.

correct, capable, and strategic

Full Access
Question # 111

A Business Analyst (BA) is tasked with presenting the requirements for an auto insurance product to domain and implementation subject matter experts (SMEs). What requirements viewpoints should be used by the BA?

A.

Business Process Model

B.

Organization Model

C.

Logical Data Model

D.

Scope Model

Full Access
Question # 112

A business analyst (BA) had identified redundancy in the process for the first contact resolution for customer issues: currently two separate a visions handle this task. A new solution identifies a single point of contact that will eliminate the redundancy. What can the BA do to highlight the required changes to the structure?

A.

Current state description

B.

Policies and procedures

C.

Business capability analysis

D.

Organizational modeling

Full Access
Question # 113

A business analyst (BA) conducts a Business rules analysts exercise to identity the organizational rules constraining the project in addition to existing regulations and contracts. what else does the BA check?

A.

Backlogs

B.

Policies

C.

Business case

D.

Permissions matrix

Full Access
Question # 114

Before the start of a large, cross functional change effort, the team of Business analysts (BAs) assigned decided they need something to help them ensure requirements collectively support one another and do not conflict. What option would provide the consistency they are looking for?

A.

Process modeling

B.

Functional decomposition

C.

plate Architecture

D.

Checklist

Full Access
Question # 115

A business analyst (BA) has completed requirements elicitation and modeling on a project to implement a new case management system. During analysis of the requirements, the BA notices that one of the requirements appears to be in conflict with the company's case management policies. What should the BA do?

A.

Request modification to the polices and identify the changes as an assumption and a dependency

B.

Create a requirement to indicate the change to the current policies and update the information in the models

C.

Modify the requirements to adhere to the existing policies and note the change in the models

D.

Identify the policies as a potential constraint and review with management

Full Access
Question # 116

A business analyst (BA) has recently completed a comprehensive stakeholder analysis. Next the BA would like to consider ways in which to ensure that the stakeholders remain engaged throughout the change strategy. Some of the considerations include timing and frequency, location, available tools, delivery methods and the stakeholders' preferences. In which of the following plans would the BA document these considerations?

A.

Stakeholder Collaboration Plan

B.

Business Analyse Plan

C.

Stakeholder Analysis Plan

D.

Communications Management Plan

Full Access
Question # 117

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I. Ability to integrate online maps and global positioning system (GPS) technology with the mobile application In real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1. The company's mobile application platform must support real time integrate with the following third party systems:

A GPS System

B. Postal Code Validation

What kind of relationship is used to describe the traceability between requirement 8 and the solutes artifacts that implement it?

A.

Satisfy

B.

Validate

C.

Depends

D.

Derive

Full Access
Question # 118

While working on a major project to replace the billing mechanism at a bank, a major change in scope is discussed. Which approach does the business analyst (BA) use to help determine the formality of the assessment process to be followed to understand the impacts of the scope change?

A.

Governance

B.

Information management

C.

Stakeholder engagement

D.

Solution

Full Access
Question # 119

A business analyst (BA) is tasked with developing a business analysis plan and must decide the best approach to use. Which of the following factors would drive the decision towards an adaptive approach?

A.

Engaging stakeholders presents significant challenges.

B.

The risk of an incorrect implementation is unacceptably high.

C.

Requirements can effectively be defined ahead of implementation.

D.

The organization's tolerance for uncertainty is high.

Full Access
Question # 120

An organization is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content in many instances, multiple teams are defining the same functionalities while other functionalities are not being defined at all leading to unclear understanding of business requirements.

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases; but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

What analysis approach must the BA use to determine changes required to address the training needs?

A.

Market

B.

Decision

C.

Root cause

D.

Future state

Full Access
Question # 121

A solution implemented three months ago has decreased performance as the volume of transactions has increased. A business analyst (BA) is tasked with analyzing the performance of the application and providing recommendations.

What actions does the BA need to take?

A.

Develop new performance metrics

B.

Complete a decision analysis

C.

Perform a root cause analysis

D.

Re-analyze the current performance metrics

Full Access
Question # 122

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The BA will create a Data Model to meet which requirement?

A.

Requirement ID F-R0002

B.

Requirement ID FE10001

C.

Requirement ID NFP0002

D.

Requirement ID F-R0003

Full Access
Question # 123

A company with a big information technology (IT) department has hired a lead business analyst (BA) to enhance its business analysis practices. The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders, including project managers, are blaming long cycles of analysis for the delays. The business analysts, in turn, feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables. All of the evidence is anecdotal and none of the groups could strongly substantiate their opinions.

Even after dozens of reviews, some stakeholders refuse to sign off on the requirements specification documents because of a few questionable requirements. This puts the projects at risk and creates tension between the participants. What should the lead BA do first?

A.

Escalate the problem to the executive management

B.

Set limits on duration of sign-offs and the number of reviews

C.

Track approvals al the level of individual requirements

D.

Offer the stakeholders incentives to sign off documents sooner

Full Access
Question # 124

Stakeholders have indicated concerns with the level of uncertainty they are willing to accept with the solution.

What type of analysis can the business analyst (BA) use to alleviate these concerns?

A.

Gap

B.

Financial

C.

Requirements

D.

Risk

Full Access
Question # 125

A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.

The BA has collected the following information over the last three months pertaining to these business processes:

•All the business processes are at their maximum capacity in terms of the current number of transactions.

•Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.

The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

Assuming the BA's recommendation to be true, what will be the new success rate of the mortgage closure process?

A.

90%

B.

85%

C.

10%

D.

20%

Full Access
Question # 126

A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst

(BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations.

Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time.

By proposing this change, what type of view did the BA use to analyze the current manufacturer's state?

A.

Data-centric

B.

Capability-centric

C.

Process-centric

D.

People-centric

Full Access
Question # 127

A project is implemented using a predictive approach. Unfortunately, a lot of change requests (CR) have been raised. A project manager (PM), who should approve each change request, is overworked.

What could the business analyst (BA) propose to make things better?

A.

Approve the CRs independently for the PM

B.

Transfer responsibility from the PM to a project's sponsor

C.

Revisit the Business Analysis Governance approach

D.

Decline CRs because of the approach

Full Access
Question # 128

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I.Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II.Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III.Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1.The company's mobile application platform must support real time integration with the following third party systems:

A ) GPS System

B ) Postal Code Validation

2.The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.

3.The map display shall highlight the boundary of the search area with a dotted yellow line.

4.The extent and shape of the search area shall be determined based on one of the following user choices:

A ) Postal code – Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.

B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.

5.Subscriber shall be able to select one of the options above and supply corresponding input.

6.System shall validate the user input and display appropriate error messages if invalid.

7.Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.

8.System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.

9.The list of service providers shall include the Name, Phone Number and Street Address.

10.If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.

11.The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.

What is the appropriate diagram type to describe the association between the subscriber, the medical plan and the participating service providers?

A.

Data Model

B.

Data Dictionary

C.

Use Case Diagram

D.

Data Flow

Full Access
Question # 129

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The risk associated with Requirement ID F-P0001 is HIGH. The BA has gone back to the Crew Chief to determine why this requirement's risk is HIGH. The Crew Chief stated that it was based on an assumption.

Which of the following assumptions would make this requirement's risk high?

A.

The users will require specialized training.

B.

The web-based interface will be complex.

C.

The system will be inaccessible in remote locations.

D.

The cost of the solution outweighs its benefit.

Full Access
Question # 130

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I.Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II.Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III.Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1.The company's mobile application platform must support real time integration with the following third-party systems:

A ) GPS System

B ) Postal Code Validation

2.The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.

3.The map display shall highlight the boundary of the search area with a dotted yellow line.

4.The extent and shape of the search area shall be determined based on one of the following user choices:

A ) Postal code – Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.

B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.

5.Subscriber shall be able to select one of the options above and supply corresponding input.

6.System shall validate the user input and display appropriate error messages if invalid.

7.Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.

8.System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.

9.The list of service providers shall include the Name, Phone Number and Street Address.

10.If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.

11.The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.

Which primary subscriber business need is addressed with the enhancements?

A.

Inability of a service provider to locate other participating service providers and their fee information

B.

Inability of a plan subscriber to get directions to nearby participating service providers

C.

Inability of a plan subscriber to locate and access fee information for nearby participating service providers

D.

Inability of a service provider to be alerted of the location of new plan subscribers in their vicinity

Full Access
Question # 131

A floral company wants to gather information about each of its 30 international facilities to determine whether employees are satisfied with their jobs.

Which of the following elicitation techniques should the business analyst (BA) use?

A.

Survey

B.

Decision analysis

C.

Observation

D.

Concept modelling

Full Access
Question # 132

The business analyst (BA) is preparing to determine the impact of various risks associated with the business analysis effort currently underway.

Which of the following would the BA use as an input into the assessment of risk?

A.

Defined change strategy

B.

Analysis of potential value of the recommended solution

C.

List of prioritized requirements

D.

Unconfirmed results of elicitation activities

Full Access
Question # 133

A company with a big information technology (IT) department has hired a lead business analyst (BA) to enhance its business analysis practices. The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders, including project managers, are blaming long cycles of analysis for the delays. The business analysts, in turn, feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables. All of the evidence is anecdotal and none of the groups could strongly substantiate their opinions.

The lead BA wants the BAs to report anticipated and actual completion dates for their deliverables, as well as the time spent on planned and unplanned activities. What is the lead BA trying to do by analyzing the results of such measurements?

A.

Identify typical missing or wasteful activities

B.

Ensure even workloads of the BA

C.

Establish an equitable compensation system

D.

Motivate the BA to work belter

Full Access
Question # 134

After the new report "Customer Sales by Date" was deployed last week, the sales team is now unable to generate the previously existing report "Consolidated Sales by Customer, " which is causing customer dissatisfaction.

What could the business analyst (BA) have assessed to prevent this situation?

A.

Current state and stakeholder needs

B.

Solution assessment results

C.

Strengths, weaknesses, and threats

D.

Balanced scorecard

Full Access
Question # 135

A non-profit utility company has 900 employees, a majority of whom are hourly employees and must track their time using a paper based process A few years ago, the Director of Human Resources purchased a software system to eliminate the current paper-based time reporting process. No requirements specific to the utility company were defined prior to the purchase. A team was formed to implement the software During implementation process, the team discovered the software lacked functionality and was not robust enough to support the general ledger requirements The company stopped the effort and incurred a $500,000 USD loss on the cost of the software.

This year, the Director of Finance requested that a team investigate the current paper based time reporting process and recommend solutions. The Director of Finance feels that the Director of Human Resources must be involved as a critical stakeholder. The Director of Human Resources is still bitter about the last effort because the process stopped'.

During a brainstorming session on improvement opportunities, the Director of Human Resources repeatedly interrupts the group and states why the proposed ideas will not work.

Which approach should the business analyst (BA) take to refocus the group?

A.

Continue the activity with the group and provide a report

B.

Reschedule the session without the Director of Human Resources

C.

Pause the activity and reiterate the rules to the entire group

D.

Ask the Director of Human Resources to observe instead of participate

Full Access
Question # 136

A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of "Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".

The BA defined the following use cases:

•"Change system parameters"

•"Setup new supervisor"

•"Send mail notification"

•"Send SMS notification"

•"Send notification"

•"Pass a two-factor authentication"

The BA wants to create a Use Case diagram.

What standard relationship should be defined between "Change system parameters", "Setup new supervisor" and "Pass a two-factor authentication"?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 137

A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years.

The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site.

The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims There were 100 customers that were part of the Pilot that represented 25 different industries. The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims.

The sites Features were as follows:

* Improvements to the search engine to all customers to search for articles, tools and services on the site

* A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc. for an area of their facility.

* A promotion feature - where Risk preventing Articles, and tools on the site are marketed toward a customer.

* A profile section allowing for Customer Name, Address and contact Phone number.

Alter the 12 month pilot the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spent a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced.

Regarding the use of promotions the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out a survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry.

The BA asked for a dump of all documentation of the 1000 claims that were filed over the 12 month pilot period. The BA found the nearly 90% of the claim filed were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be sorted at the top giving the customer a more personalized experience.

What technique was the BA using to understand why the promotions were not being viewed?

A.

Use cases and scenarios

B.

Benchmarking and market analysis

C.

Observation

D.

Data mining

Full Access
Question # 138

During a prioritization meeting, a business analyst (BA) mentioned that the access management system requirements are not stable. The project manager and a team lead proposed removing the requirements from discussion. A domain subject matter expert (SME) insisted on making that requirement a high priority, because it is really important from their point of view.

What should the BA do?

A.

Make the requirement a lower priority to minimize unanticipated rework and wasted effort

B.

Set the requirements at a high priority to adhere to the SME's point of view

C.

Remove the requirement from the project

D.

Leave priority unfilled for these requirements

Full Access
Question # 139

An organization Is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content in many instances, multiple teams are defining the same functionalities while other functionalities are not being defined at all leading to unclear understanding of business requirements

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases, but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

Which stakeholders would the BA interview to determine the changes needed to the comparison tool?

A.

Regulator and Operational Support Manager

B.

Implementation Subject Matter Expert and Tester

C.

Domain Subject Matter Expert and End User

D.

Project Manager and Project Sponsor

Full Access
Question # 140

A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed.

In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief

Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational.

A business analyst (BA) has been brought in to help with planning the project and gathering requirements. What tool will help the BA understand the changes needed to keep the majority of the stores open?

A.

Capability Model

B.

Business capability analysis

C.

Transition State Diagram

D.

Stakeholder Matrix

Full Access
Question # 141

A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of "Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".

The BA defined the following use cases:

•"Change system parameters"

•"Setup new supervisor"

•"Send mail notification"

•"Send SMS notification"

•"Send notification"

•"Pass a two-factor authentication"

The BA wants to create a Use Case diagram.

Which technique should be used to define a communications protocol between the PS and other systems?

A.

Vertical prototyping

B.

Interface analysis

C.

Concept modelling

D.

System analysis

Full Access
Question # 142

An organization implements a solution to increase the efficiency of its internal processes. The business analyst (BA) felt that the success of the solution is tied to the organizational structure and confirmed that the solution conforms to the organizational hierarchy. After the solution rolled out, the solution was not widely adopted among stakeholders and some features were not being utilized.

Which aspect of the organizational structure did the BA fail to consider?

A.

Reporting needs

B.

Manager ratios

C.

Informal relationships

D.

Structural complexity

Full Access
Question # 143

A business analyst (BA) is preparing to specify requirements. Various attributes can be specified for each requirement or set of requirements.

Which approach contains a suitable set of attributes?

A.

Stakeholder Engagement

B.

Information Management

C.

Business Analysis

D.

Governance

Full Access
Question # 144

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The BA is working on identifying additional improvement opportunities based on these requirements. Which of the following improvement opportunities is reflected in Requirement ID NFP0002?

A.

Additional capability

B.

Increased efficiency

C.

Defined relationship to information

D.

Improved access to information

Full Access
Question # 145

A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.

The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution

consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.

The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.

What should define the timing of business analysis work in this project?

A.

Buy-in of the proposed solution

B.

Approach used by the previous deployments

C.

Availability of solution consultants

D.

Overall project schedule

Full Access
Question # 146

A business analyst (BA) wants to estimate the potential value delivered by a set of requirements and design options by targeting a small group of stakeholders to understand their perceived value and expectations. The BA is going to organize a discussion during which feedback is collected.

Which technique will be used?

A.

Focus Group

B.

Brainstorming

C.

Survey

D.

Group interview

Full Access
Question # 147

A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.

The BA has collected the following information over the last three months pertaining to these business processes:

•All the business processes are at their maximum capacity in terms of the current number of transactions.

•Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.

The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

If an additional recommendation to reduce Verification Rejects by 50% were to be introduced into the mortgage origination process, what is the potential success rate of the mortgage origination process?

A.

86%

B.

83%

C.

70%

D.

74%

Full Access
Question # 148

A business analyst (BA) has been assigned to manage the ongoing stakeholder collaboration after completing a project. The BA needs to understand the stakeholders' level of satisfaction and wants to offer stakeholders an opportunity to help improve the working relationships based on this information.

Which technique should the BA use?

A.

Risk analysis and management

B.

Brainstorming

C.

Collaborative games

D.

Lessons learned