Labour Day Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: mxmas70

Home > Netapp > NCSIE ONTAP > NS0-184

NS0-184 NetApp Certified Storage Installation Engineer - ONTAP Question and Answers

Question # 4

You are preparing for the installation of a new ONTAP 9.8 cluster and need to get the preinstallation information from the customer.

In this scenario, which NetApp tool would you use to create a configuration spreadsheet template for the deployment?

A.

Interoperability Matrix Tool

B.

ConfigBuilder

C.

Active IQ Config Advisor

D.

Active IQ Unified Manager

Full Access
Question # 5

You have a 2-node FAS8300 switchless ONTAP 9.8 cluster that serves NAS volumes. You have a data SVM that connects to the network using multimode LACP with VLAN tags.

In this scenario, which front-end FAS8300 network port would you create the data LIFs?

A.

a0a

B.

e0e

C.

e0e-100

D.

a0a-100

Full Access
Question # 6

An administrator issued the cluster setup command and configured a 2-node ONTAP 9.8 cluster.

In this scenario, which tool would the administrator use to validate the configuration?

A.

Active IQ Upgrade Advisor

B.

Interoperability Matrix Tool

C.

NetAppDocs

D.

Active IQ Config Advisor

Full Access
Question # 7

Which two switch operating system are supported on ONTAP cluster switches? (Choose two.)

A.

Brocade FOS

B.

Cisco NX-OS

C.

Cisco IOS

D.

Broadcom EFOS

Full Access
Question # 8

You want to disconnect a DS224C shelf with 3.8 TB NetApp Storage Encryption (NSE) SSDs to an AFF A300 HA pair with two DS224C shelves with 3.8 TB SSDs without NSE in one stack.

In this scenario, how would you add the shelf?

A.

Add the shelf to the existing stack.

B.

Create a new stack on the HA pair to add the shelf.

C.

Connect the shelf to an HA pair with NSE drives.

D.

License NSE and add the shelf to this HA pair as a new stack.

Full Access
Question # 9

You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF.

In this scenario, which two steps are required to install the AFF A250 system? (Choose two.)

A.

Load the Storage RCF.

B.

Cable the AFF A250 nodes to the next free ports on the switch.

C.

Cable the AFF A250 nodes to the breakout ports on the switch.

D.

Load the Cluster-HA-Breakout RCF.

Full Access