Labour Day Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: mxmas70

Home > BICSI > BICSI Certification > INSTC_V7

INSTC_V7 BICSI Installer 2 - Copper Exam Question and Answers

Note: This exam is available on Demand only. You can Pre-Order this Exam and we will arrange this for you.

Pre-Order Your "INSTC_V7 - BICSI Installer 2 - Copper Exam" Exam

You can pre-order your "BICSI Installer 2 - Copper Exam" exam to us if you are in need this urgent. Dumpsmate.com Team will prepare your Exam Questions & Answers From Real Exam within next 2 to 3 Weeks Time only.

How to Make Pre-Order You Exams:

  1. 1. Click to "Add to Cart" Button.
  2. 2. Our Expert will arrange real Exam Questions within 2 to 3 weeks especially for you.
  3. 3. You will be notified within 2 to 3 Weeks' time once your Exam is ready with all Real Questions and Possible Answers with PDF + Testing Engine format.

Why to Choose DumpsMate?

In the unlikely event if we can't make this exam available to you then you will issue a full refund! So there is no risk.

READY TO MAKE YOUR "INSTC_V7" PRE-ORDER?

$850

 Add To Cart
Question # 4

What is the minimum recommended amount of vertical clearance for open-top cable supports?

A.

75 mm (3")

B.

100 mm (4")

C.

125 mm (5")

D.

150 mm (6")

Full Access
Question # 5

A third 90-degree bend may be permitted in a conduit run if the run does NOT exceed ______?

A.

5 m (16.5')

B.

10 m (33')

C.

15 m (50')

D.

30 m (100')

Full Access
Question # 6

How far should the top of a ladder extend above the roofline?

A.

0.3 m (1')

B.

0.5 m (1.6')

C.

0.6 m (2')

D.

0.9 m (3')

Full Access
Question # 7

How many cycles are in 10Hz?

A.

1

B.

5

C.

10

D.

20

Full Access
Question # 8

Unqualified workers must stay AT LEAST ____ from exposed energized conductors operating at 300 to 50,000 V.

A.

0.3 m (1')

B.

3 m (10')

C.

15 m (50")

D.

30 m (100')

Full Access
Question # 9

Which of the following attachment methods does BICSI recommend for attaching coaxial connectors to coaxial cable?

A.

Screw-on

B.

Push-on

C.

Compression

D.

Crimp

Full Access
Question # 10

Which of the following PPE items MUST be worn at all times when you are working with or handling OF?

A.

Fall Protection

B.

Eye Protection

C.

Hearing Protection

D.

Breathing Protection

Full Access
Question # 11

Which of the following steps should be performed first when an installer is pulling optical fiber cable?

A.

Install and secure innerduct

B.

Ensure the cable has been tested and accepted

C.

Label cables

D.

Attach pull rope

Full Access
Question # 12

Which of the following fire ratings refers to the time period that a fire-rated assembly can resist flame passage?

A.

L rating

B.

F rating

C.

W rating

D.

T rating

Full Access
Question # 13

What is the minimum inside bend radius for balanced twisted pair (4 pair) cable?

A.

25 mm (1")

B.

50 mm (2")

C.

4 times the outside cable diameter

D.

15 times the outside cable diameter

Full Access
Question # 14

Which of the following is a floor serving space that serves as a point of termination for horizontal and backbone cables?

A.

EF

B.

ER

C.

TR

D.

TE

Full Access
Question # 15

What is the recommended minimum amount of aisle space between and around equipment?

A.

0.6 m (2')

B.

1 m (3.3')

C.

1.2 m (4')

D.

1.52 m (5')

Full Access
Question # 16

Which of the following steps should be performed first when terminating a coaxial cable?

A.

Verify connector type

B.

Cut the cable

C.

Strip the cable

D.

Fold back the braiding

Full Access
Question # 17

You are terminating a category 3 cable. What is the maximum permissible amount of untwisting?

A.

25 mm (1")

B.

38 mm (1.5")

C.

75 mm (3")

D.

100 mm (4")

Full Access