Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: myex65

Home > SAP > SAP Certified Specialist > E_S4CON_2505

E_S4CON_2505 SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade Question and Answers

Question # 4

You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correctanswersto this question.

A.

Modification adjustment (SPAU)

B.

Modification adjustment (SPDD)

C.

Activation of dictionary objects (ACT_UPG)

D.

Conversion of application tables (PARCONV_UPG)

Full Access
Question # 5

You are running an SAP ECC system. For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correctanswersto this question.

A.

Use DMO for SUM.

B.

Perform an SAP S/4HANA conversion without DMO.

C.

Perform an SAP S/4HANA conversion including DMO.

D.

Upgrade the SAP system.

E.

Apply SAP support packages.

Full Access
Question # 6

Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correctanswersto this question.

A.

Uninstall industry extensions NOT supported by SAP S/4HANA.

B.

Delete client 066 (Early-Watch client).

C.

Uninstall Fiori apps NOT released for SAP_UI 7.50.

D.

Install add-on SAP Gateway 7.50.

Full Access
Question # 7

What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correctanswersto this question.

A.

You can find the optimal number of parallel R3load processes by monitoring host performance.

B.

You can record the modification adjustment during migration and use the transports in the next runs.

C.

You can verify that the content of the download directory matches the stack.XML file.

D.

You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.

Full Access
Question # 8

You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

A.

The end of the database migration

B.

The start of the Execution roadmap step

C.

The end of the business downtime

D.

The start of the business downtime

Full Access
Question # 9

SUM was registered at the SAP Host Agent. Where does the SAP Host Agent find the path to the SUM directory?

A.

The path was stored in file host_profile during registration.

B.

The path was stored to the environment of user adm during registration.

C.

The path is taken from the URL entered in the browser to start SUM.

D.

The path was stored in file sumabap.conf during registration.

Full Access
Question # 10

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correctanswersto this question.

A.

TABIM_UPG

B.

PARDIST_SHD

C.

PARMVNT_UPG

D.

TABIM_SHADOW_*

Full Access
Question # 11

You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

A.

During the Execution roadmap step

B.

During the SUM technical downtime

C.

Before the start of the SUM technical downtime

D.

After SUM has ended

Full Access
Question # 12

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correctanswersto this question.

A.

SAP S/4HANA conversion including database migration and Unicode conversion

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migration SAP S/4HANA conversion without database migration

D.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

Full Access