You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correctanswersto this question.
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correctanswersto this question.
Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correctanswersto this question.
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correctanswersto this question.
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
SUM was registered at the SAP Host Agent. Where does the SAP Host Agent find the path to the SUM directory?
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correctanswersto this question.
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correctanswersto this question.