What are the two related lists a consultant will need to pay attention to when viewing Assets that may have been replaced and/or upgraded by new Assets out in the field?
A customer has few types of resources: internal full-time, internal part-time, and full-time contractors. The requirement is to prefer full-time employees over contractors, and contractors over part-time employees.
How should a consultant implement this requirement?
Dispatchers have noticed that every time they run Global Optimization it fails. They have verified that the 'Optimization User' is active.
How can an admin troubleshoot this issue?
A customer wants to collect a mobile worker's geolocation history in the Field Service Mobile App only for some of the resources, while for others, they want this option to be disabled.
How can a consultant implement this requirement?
Dispatchers want a visual representation of when Service Appointments are getting closer to their due date on the 'Dispatcher Console'.
How can this requirement be solved?
What is the best practice to upload a photo that is taken by the mobile worker to a Work Order? (Choose 2 options)
Green Energy Solutions are trying to forecast the number and type of licenses needed to be purchased to support the following resource structure:
Service Territory A has 2 internal resources and 2 contractors set as capacity-based resources: ABC and XYZ, both represent a contractor company. ABC contracting company has 3 individual resources and XYZ contracting company has 4 individual resources.
What type of Field Service licenses and how many of each should Green Energy Solutions purchase?
Green Energy Solutions would like to track their vehicles' availability, so that once a Work Order is created, both a Service Resource and a vehicle need to be assigned to the work, to ensure that the resource will use an available vehicle for the job.
How would a consultant recommend implementing this requirement?
A division of Green Energy Solutions has different work hours for each day, and the daily hours are inconsistent from one week to another (example: this Monday 9 am-4 pm, this Tuesday 8 am-6 pm, next Monday 8 am-3 pm, next Tuesday 9 am-2 pm). This creates a lot of overhead.
What can an administrator configure to add efficiencies into their scheduling process and mitigate administrative overhead?
A customer outsources some of the work to contractors. The contractors in company A need to be able to accept up to 4 hours of maintenance work per day, but their resources only work 9-10 am. They manage the scheduling and order of these jobs outside of Salesforce.
Contractor company B also must only accept 4 hours of work per day but work from 9-5 pm and manage their schedule inside Salesforce. The customer is using optimization.
Which two configurations need to be created to support the requirement?
A company wants to evaluate whether Global Optimization is giving them the desired results like reduced travel or improved resource utilization. As a result of the evaluation, the company has decided to deploy globally.
What should an admin do to provide visibility into KPI improvements for Global Optimization?
Green Energy Solutions performs solar panel maintenance activities on their customers' Assets and has several customers in Narnia, a remote isolated town within the Service Territory. There is only one resource covering that territory.
The dispatcher noticed that instead of grouping all of the Narnia activities for the same day, optimization is spreading these activities across the entire week, adding maintenance activities at other locations on the way to and back from Narnia.
Although when comparing in a test environment the two schedules, the way optimization is behaving today produces lower weekly total travel than when grouping all Narnia visits to the same day, Green Energy Solutions would prefer to have the resource complete all solar panel maintenance activities at Narnia on the same day, as it will help with change management and user acceptance.
Which three different configuration changes could a consultant evaluate to drive such optimization behavior? (Choose 3 options)
A customer provides services for a variety of products, and the capability for resources to perform services is often machine-specific. The customer explains that there are about 100 combinations of services and products that a single resource may support, and is concerned about performance.
Which configuration option should a consultant recommend?
Universal Containers has a job that requires two technicians, and both must possess the skills defined as 'Required' for that job. They need to show up at the same time and work through the entire job duration together. The technicians will also need to be able to be assigned to individual jobs later that day.
Which option should an architect recommend to support this scenario?
After running an optimization request for the next day, the dispatcher at Green Energy Solutions had noticed that the schedule of most of the Service Appointments has not changed at all, even though there were other better available options, considering the Service Objectives defined within the Scheduling Policy that was used for the Global Optimization.
What are three potential reasons for this behavior? (Choose 3 options)