A VMware Cloud Foundation (VCF) architect is planning for the expansion of an existing VCF instance.
The existing VCF instance is deployed with a single workload domain. The number of ESXi hosts has grown to the maximum number the existing vCenter can support.
Which design decision would the architect need to make to allow the existing VCF Instance to add more ESXi hosts?
During an initial design workshop with stakeholders, an Architect was provided with an overview of the current state and other information required to proceed to the design phase.
Which statement should be documented as arequirement?
Existing environment:
3 vSphere clusters, 5 hosts each.
Networking = vDS.
Storage = NFSv3.
Managed by single vCenter.Architect decides to create a new VCF fleet with a single VCF instance.
What design implication should be documented?
Which design defines how to arrange and use components and features of the infrastructure to satisfy service dependencies and other relationships specified in the Conceptual Model?
As part of an initial stakeholder meeting, one of the stakeholders has stated the following:
The initial design must be completed within the next 3 months so that hardware can be ordered within the current budget cycle.
How would the architect classify and record this statement?
An architect is designing a VMware Cloud Foundation (VCF)-based solution. The company policy mandates that all VCF patches and upgrades must be tested in a development environment before applying to production.
Which VCF construct design decision would comply with this mandate?
An architect is responsible for designing a new VMware Cloud Foundation (VCF)-based Private Cloud solution. During the requirements gathering workshop with key customer stakeholders, the following information was captured:
The solution must support a yearly workload growth of up to 10%.
When creating the design document, which design quality should be used to classify the stated requirements?
An architect had been given a constraint to use an existing storage array to support the virtual infrastructure design project.
The architect documents the following:
Assumption 01:The existing storage array has sufficient capacity and performance to support the intended workloads.
Risk 01:There is a risk that the performance and capacity of the existing storage array may not be sufficient for the solution.
How would the architect mitigate the risk?
An architect is designing a VMware Cloud Foundation (VCF) solution for a customer. During the discovery phase, the customer outlined the following availability requirements:
Business-critical workloads:RPO = 2 hours
Infrastructure components:RTO = 8 hours
Based on this context, what does the RTO metric represent?
A company is deploying a new VMware Cloud Foundation (VCF) environment to support their growing infrastructure requirements.
The company is planning to scale their environment over time by adding more workload domains as new applications and departments are onboarded.
The company requires that the architecture must be highly scalable and flexible, able to accommodate both current and future demands. They also require a seamless transition when adding new workload domains.
Which design decisions should the architect make to meet the stated scalability requirements and facilitate the future growth?
During a design workshop, the security team provides the following requirement for the VMware Cloud Foundation (VCF) Automation deployment:
All Virtual Machine images must be reviewed and vetted by the security team prior to consumption.
Which Content Library type supports the requirement?
An architect is designing a Business Continuity Disaster Recovery (BCDR) strategy for a Virtual Cloud Foundation (VCF) environment with a management domain and multiple workload domains deployed in two datacenters located in the same city.
During one of the initial workshops with stakeholders, the following information was identified:
The Recovery Time Objective (RTO) for workloads is 24 hours.
The management domain must remain continuously available with Recovery Point Objective (RPO) of 0.
Hardware overhead should be minimized by utilizing standby resources that host test workloads during normal operation.
Operational overhead should be minimized.
Latency between both datacenters is 2 ms.
Which design decision should the architect document to satisfy provided requirements?
As part of a design for a VMware Cloud Foundation (VCF) solution, an architect has documented the following dependencies and constraints:
CONSOOl - Internet access will not be permitted from anywhere within the VCF solution.
CONS002 - The password must not be stored in plain text anywhere within the VCF solution.
DEP001 - The customer must make the required VCF binaries accessible to the VCF Installer appliance during the deployment phase.
Which design decision should the architect include in the design for the download of the VCF binaries?
An architect is designing a VMware Cloud Foundation (VCF) deployment to meet the following design requirements:
• Tenants need dedicated external network access.
• The number of NSX Edge clusters should be minimized.
To fulfill these requirements, the architect made a design decision to use a Workload Networking VPC with Full Services Model.
Which additional design decision should be considered as part of the logical network design?
A customer has a new initiative to build a private cloud based on VMware Cloud Foundation (VCF). The customer technical team is presenting an overview of the current state of the infrastructure as well as describing what the expectations are for the private cloud.
Based on the notes captured by the architect, which statement should be documented as a constraint?